Shape Up cadence
Pitches, appetites, cycles, cooldown.
This project uses Shape Up instead of Scrum. Solo-dev-plus-AI-sub-agents makes Scrum ceremonies degenerate — Shape Up’s primitives translate cleanly.
Core concepts
| Shape Up | This repo |
|---|---|
| Pitch | A written issue spec — problem, appetite, solution sketch, rabbit-holes, no-gos. Examples: INTEGRATION-PLAN.md entries; .github/ISSUE_TEMPLATE/ forms |
| Appetite | Phase or milestone — fixed time, variable scope |
| Betting table | Monday ritual: pick the next pitch, hand the scope to Claude Code |
| Cycle | The phase duration |
| Cooldown | 2-day gap after each phase — no new features, only docs / refactors / dep bumps / debt-paying |
Cooldown is structural, not on honor
Between phases, main carries a cooldown/<phase>-end git tag. prometeo refuses
to plan type:feat issues until the tag is replaced by cooldown-cleared. Only
type:chore and type:docs pass during cooldown.
The Monday ritual (15 min, solo)
- Open
ROADMAP.md, pick a phase / milestone — that’s the appetite - Open or write the pitch as a GitHub issue (use
.github/ISSUE_TEMPLATE/) - Hand the scope to Claude Code — prometeo plans, you approve, forja+centinela execute per issue
- Friday afternoon: hill-chart update on
ROADMAP.md - End of phase: cooldown — no new features, only debt-paying work
Why Shape Up over Scrum?
- Fixed time, variable scope — the scaffold ships incrementally; a sprint that misses its scope goal feels like failure. Shape Up treats scope as the lever.
- No estimation debt — pitches contain appetite (time box), not story-point estimates. One number, not two.
- Cooldown pays debt — mandatory cooldown after each phase prevents the accumulation of known-bad code that Scrum often lets slide.
Decision recorded in ADR 0001.